Home || Permalink
U N I T E D N A T I O N S

Distr.
GENERAL

A/AC.25/6/Corr.2
19 July 1950

ORIGINAL: ENGLISH




UNITED NATIONS CONCILIATION COMMISSION FOR PALESTINE

FINAL REPORT OF THE UNITED NATIONS
ECONOMIC SURVEY MISSION FOR THE MIDDLE EAST

PART II

Errata

Page 2, second column: To list of conversion rates near bottom of page add: "1 Iraqi dunum of land = .625 acres = .25 hectare"
Page 31, First column:For table near bottom of page substitute following:
"Present
gross
acreage
irrigated"
Additional
gross
irrigated
acreage
possible
Final total
gross
irrigated
acreage
possible
Euphrates
3,000,000
2,500,000
5,500,000
Tigris
5,000,000
5,500,000
10,500,000
Total
8,000,000
8,000,000
16,000,000"
Page 57, second column: Summary of Terracing Project. For last column of figures in table substitute following:
"Cost £P
720,300.
720,300
1,440,600"
Page 58, In last two columns of table at top of page:
For:


Read:
" 806,400
806,400
1,612,800
"720,300
720,300
1,440,600 .
2,257,920
2,257,920
4,515,840"
2,016,840
2,016,840
4,033,680"
Page 59, first column, third line from bottom
For:
£P 6,144,000Read: £P 5,488,000"
Page 59, second column, in final column of table at top of page:
For:
"2,500
2,500
5,000
7,000
7,000
14,000"
Read: "2,195 6,146
2,195 6,416
4,390 12,292"
For "28, 298"Read: "28,400"
For: "79, 200"Read: "79, 500"
For: "148,545"Read: "148,750"
For: "315,900"Read: "416, 500"
Page 62, last column:In the table giving summary of all projects for Syria, under "A- Terracing" should read: " $US.
"US.
1,079,700
927,500
1,573,900
3,581,100
7,162,200"
Page 62, line 5:Add: "Total length of terraces to be constructed 13,000 kilometres. "
Page 63,
line 10:For "15 semi-skilled labourers" read: "13 semi­skilled labourers."
line 17:Instead of: "24.8" read: "22. 10"
line 18:To read: "( b) Supervision and Transport: £P 98,500 (estimated) ÷13,000,000 = .76"
line 20:Instead of: "25.56" read: "22.86"
line 21:Instead of: "25.56" read: "22.86"
line 22:Instead of: "£P 15.36" read: "£P 13.72"
line 32:Instead of: "£P 15.35" read: "£P 13.72"
Page 63, (cont'd. )After line 32: add the following headline: "Complete Project for Two Years "
last line of Section II:For: "cost £P 1.612,800" read: "Total Cost £P I, 440, 600"
Page 64, First column:line 30: For: "15 semi-skilled labourers" read: "13 semi­skilled labourers."
line 37: For: "24.8"read: "22.10"
line 40: For: "25.56"read: "22.86"
line 41: For: "£P 15.36"read: "£P 13.72"
line 43: For: "£P 6, 144,000"read: "£P 5,488,000"
Second column:line 10: For: "£P 15.36"read "£P 13.72"
line 11: For: "£P 2,457,600 (say £P 2.5 millions)" read: "£P 2,195,200 (say £P 2.2 millions)"
line 19:For: "Total Cost £P 5 millions" read: "Total Cost £P 4, 390,000"
line 29: For: "20 years" read "2 years"
line 34: For: "£P 64.56"read "£P 64.50"
line 36: For: "£P 77.36read "£P 77.30"
line 40: For: "£P 77.36" read "£P 77.30"
line 40: For: "£P 56,595"read "£P 56,800"







Document in PDF format

Commission de conciliation - la mission d'enquête économique - rapport partie 2 (Corrigendum) Français